|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
36A | 36 | 35 | 35A | 39 | |||||
|
|
|
|
|
|
|
|
|
|
12.Lubricateweepseal(36).Place,weepseal(36),andpressurering(36A)into the seal sleeve (35). Assemble the
13.Place support ring (41) and v-sleeves (40) into valve casing (43).
14.Press seal sleeve assembly into the manifold and seat firmly. Put the support ring (41) on plunger with
17.Next, place valve assemblies (46A) into manifold after first lu- bricating the
15.Placeentiremanifold/sealsleeve assembly over the studs and push firmly until seated against the crankcase.
18.Replace plug with
6 4 2 7
8 1 3 5
16.Tighten hex nuts (49A) in a crosswise pattern (shown above) to 60
19.Fillcrankcasewithapproximately 116 fluid ounces of Giant oil or equivalentSAE90industrialgear oil and check oil level of the crankcase with the dipstick. Properleveliscenteroftwolines. Reinstall your Giant LP pump into your system.
Contact Giant Industries or your local distributor for maintenance
of the gear end of your pump. Phone:
Contact Giant Industries for service school information. Phone: (419)
10