Goetti Air Conditioning Heat Pump manual 24V OUT COM, Jumper Wire, flfl H

Models: Heat Pump

1 16
Download 16 pages 54.32 Kb
Page 9
Image 9
24V OUT COM (_)

4.A field check-out of the defrost control board can be made by the following steps:

1.Attach a "jumper"wire across the two terminals of the sensor wires (see wiring diagrams on pages 11 through 14 showing the sensor being wired to the =COM" terminal of the defrost control board).

=Attach a "jumper" wire across the two "TST" terminals. The timing cycles are divided by a factor of 256. (e.g. 90 minutes is reduced to 21.1 seconds, 60 minutes to 14 seconds and 30 minutes to 7 seconds). At "T1" setting the unit should go into defrost in 7 seconds.

1For this test, the unit will stay in "defrost" for only about 2 to 3 seconds due to the 10 minute override. (L_. = 2.3 seconds)

°°°

TST

HLD

24V OUT COM (_)

 

H

flfl H

0

 

0

 

T3

T2

T1.

 

 

 

JUMPER WIRE

FIGURE 3

T3 = 90, T2 = 60, T1 = 30

-7-

Page 9
Image 9
Goetti Air Conditioning Heat Pump manual 24V OUT COM, Jumper Wire, flfl H