Install the Solenoid Valves
1.Disconnect main power. Open the Control Box.
2.Install the two solenoid valves (713) in positions A2 and A3 as shown below.
3.Connect the wires. Solenoid A2: black to pin 7 and
red to pin 8. Solenoid A3: black to pin 9 and red to pin 10.
4.Remove the plugs from the ports at the bottom of the solenoid manifold. Install the male connectors (718).
5.Install the air tubing. See page 3.
713 | 12VDC | ||
A2 (713) | |||
|
| ||
A3 (713) |
|
| |
| 12VDC |
FLOW METER A
AIR FLOW SWITCH 1
GFB 1 PRESSURE SWITCH/
AIR FLOW SWITCH 2
|
| A2 | A3 |
|
|
|
|
| RED |
|
|
|
| GREEN |
|
|
| ti16520a | |
ti15730a | 718 |
|
| |
ALARM | + |
| 1 |
|
| - |
| 2 |
|
|
| 3 |
| |
|
|
| 4 |
|
|
|
| 5 |
|
MANIFOLD |
| 6 | A2: black to pin 7, | |
| 7 | |||
| BLACK |
| red to pin 8 | |
PURGE A |
| 8 | ||
RED |
| A3: black to pin 9, | ||
| BLACK |
| 9 | |
DOSE A1 | RED |
| 10 | red to pin 10 |
| BLACK |
| 11 |
|
PURGE B |
| 12 |
| |
RED |
|
| ||
|
| 13 |
| |
| BLACK |
|
| |
DOSE B |
| 14 |
| |
RED |
|
| ||
DOSE A2 | BLACK |
|
|
|
RED |
| 1 |
| |
| BLACK |
|
| |
DOSE A3 |
| 2 |
| |
RED |
|
| ||
|
| 3 |
| |
| BLACK |
|
| |
GFB #1 |
| 4 |
| |
RED |
|
| ||
|
| 5 |
| |
|
|
|
| |
|
|
| 6 |
|
3X CABLE |
|
| 7 |
|
|
|
| 8 |
|
| PWR (RED) |
| 9 |
|
|
| 10 |
| |
| COM (BLACK) |
|
| |
| SIG (WHITE) |
| 11 |
|
| SHIELD/GRN |
| 12 |
|
|
|
| 13 |
|
14
SIG
COM
SIG
COM
3X CABLE
PWR (RED)
FLOW METER BCOM (BLACK)
SIG (WHITE)
SHIELD/GRN
2 | 3A1332A |