Electrical Hook-up and Start-Up Procedure (All Models) (Do not plug in unit yet!)

Important: This equipment must be installed in compliance with applicable Federal, State, and/or Local electrical codes having jurisdiction. Do not use extension cords. Make sure that outlet brewer plugs into is grounded.

Important: Make sure “Main Power Switch” in back of unit is in “off” position before plugging in brewer.

Important: Domestic Q models at 208/230V must have a 4 wire electrical connection. Circuit must have 2 hots, 1 ground, and 1 neutral wire. Failure to install with 4 wire connecion will void manufactures’ warranty. Grind’n Brews that are 208/230 volt require a 20 amp circuit. Export “E” models must have a 3 wire electrical connection. Circuit must have 2 hots, and 1 ground (no neutral).

1.Plug in brewer to electrical outlet. (Or run power to unit for hardwire applications)

2.Make sure brewbasket is inserted in brewrails.

3.Reach to the back of the brewer and press the white “main power switch” to the “on” position. The front control lights will go on and you will hear water entering the brewer. The tank will fill in 2-3 minutes from the moment you pressed the “main power switch” to “on”.

4.Now that the tank is full, it will take 10-15 minutes to heat the water to brewing temperature. (Cut that time in half for the 230V “Q” models). Once the “ready” light is lit, you are ready to brew.

Brewing

Important: Brewers are factory set for the correct grind and brew times for average situations. You should not need to make adjustments in the field.

1.Make sure new paper filter is in the brewbasket and brewbasket is in place in brewer.

2.Place beans in hopper.English

3.Choose to “Grind and Brew”:

Basic Models-Press switch to “Grind’n Brew”

“H” Half batch models or all dual bean models-Press far right touchpad so “grind” and “brew” lights are lit.

4.Choose Portion:

Basic models-no choice, only full batch.

“H” Half batch models or all dual bean models-choose full or half by pressing touchpad until desired volume is lit.

5.Choose decaf or regular coffee (only applicable to dual bean Grind ’n Brews). Press left touchpad. Arrow will either point left or right for “decaf” or “regular”.

6.Place decanter or airpot under brewbasket depending on model.

7.Press Start. You will see coffee bean level go down slightly. You will hear coffee grind. Coffee automatically is ground and portioned and placed in brewbasket. Then ground coffee is automatically brewed. The “ready” light will now blink signifying that grinding and brewing is in process. This will take 3-4 minutes for a 1,7L - 1,9L pot. Portions are factory set. After brewing a pot, the tank must reheat. Reheat times are 5 1/2-8 minutes for 120V brewers and half that for 230V machines. Remember, the brewer will not function (although the grinder will) until the “ready” light is on, indicating the water is hot enough to brew. A flashing green light means brewer is reheating or there is a cycle in progress. Do not remove brewbasket while flashing.

8.On models GNB-11(11Q)(10)(10Q), press rocker switch to “Grind Only” position when you wish to grind coffee but not brew. This will allow you to grind coffee for other brewers in use. For “H” half batch and dual bean models, use following instructions on operating the touchpad.

Page 4

Grind ’n Brew Coffee Systems

Page 5
Image 5
Grindmaster 10, 21, 20 instruction manual Brewing