Grindmaster 67710E service manual Load the Coffee, Start the Brew, Brew Controls, Operation

Models: 67710E

1 19
Download 19 pages 39 Kb
Page 10
Image 10
Load the Coffee
WATER HOT FILLING COFFEE IN LINER
BREW LOCK
BREW LIGHT
START
STOP

Operation

Now that the urn has been installed and started up, it is ready for operations. This section describes the brew process from start to finish. Before brewing the first batch of coffee, follow the procedure outlined here to brew an initial batch of water only into each liner. This will rinse the components and set the gaskets and seals.

Load the Coffee

Remove the pad lock which secures the liner cover over the liner into which you want to brew.

Lift the cover to expose the brew basket. Note that the brew basket has a mesh bottom so filter paper is not required.

If there are used grounds in the basket, dispose of them and rinse the basket

Fill the brew basket with the proper amount of ground coffee to brew ten gallons. Pour the coffee directly into the basket - do not use filter paper. See the following section for

instructions on the amount and grind of coffee.

• Check the liner. The liner should be empty and clean before brewing a batch. If the liner is not empty, it will overflow when brewing.

• Place the brew basket over the liner and close the lid. You may padlock the lid at this time to prevent tampering.

Start the Brew

Turn the brew lock key to ON for the liner you are brewing to.

Check the WATER HOT light to be sure the water is up to temperature. If the light is off, wait a few moments for the urn to finish heating.

Be certain to close the cover over

the liner you wish to use.

Figure 3, Brew Controls

Press the START switch for the liner you are brewing to.

 

 

American Metal Ware 67710E Coffee Urn

Page 10

Page 10
Image 10
Grindmaster 67710E service manual Load the Coffee, Start the Brew, Brew Controls, Operation