Grindmaster AMW B-Series manual Amw B-Series, Installation Start Up Procedure, Operator Manual

Models: AMW B-Series

1 24
Download 24 pages 44.64 Kb
Page 1
Image 1
OPERATOR MANUAL

OPERATOR MANUAL

AMW B-SERIES

INSTALLATION

START UP PROCEDURE

WATER CONNECTION

The National Sanitation Foundation requires the following for an NSF approved water hook-up:

A quick disconnect water connection or enough coiled tubing so that the machine can be moved for cleaning underneath.

An approved backflow prevention device, such as a double check valve to be installed between the machine and water supply.

A 1/4” male flare adapter is provided. Installation to a water filter system is recommended to prevent lime and scale build-up in the machine.

Water pipe connections and fixtures directly connected to portable water supply shall be sized, installed and maintained in accordance with federal, state and local codes.

• Flush the water line to purge any debris from the supply line.

For 120V, 15A or 20A Service

Connect a 1/4” pressurized water line to the 1/4” male connection

(2 Wire + Ground)

 

 

(on rear of brewer) and turn the water supply on.

 

ON DUAL VOLT UNITS,

 

 

a) Minimum water pressure to the machine: 30 psi

 

FLIP SWITCH TO “120V”

b) Maximum water pressure to the machine: 80 psi

 

 

NOTE: Single head machines may be used without a pressurized water supply. (See Pour-Over Mode section)

ELECTRICAL CONNECTION

L1 N L2

CONNECT NEUTRAL (N) TO MIDDLE

CONNECT HOT (L1) TO LEFT SIDE

CONNECT GROUND TO SCREW

NOTE: Wiring connections should be performed by a qualified technician.

 

Figure A

(Refer to serial tag to verify model number of your machine)

For 120/208-240V, 20A Service

 

Remove front panel.

(3 Wire + Ground)

 

 

 

 

 

 

 

 

 

 

• Connect electrical service through rear of machine to terminal block

 

 

 

 

 

ON DUAL VOLT UNITS,

(inside front panel) marked L1, N, and L2. (See Figures A and B)

 

 

 

 

 

 

 

 

 

 

FLIP SWITCH TO “120V”

• On dual volt units, flip voltage switch (inside front panel next to terminal

 

 

 

 

 

 

 

 

 

 

block) to 120V for 120 Volt service or 240V for 120/208, or

 

L1 N L2

 

 

 

 

 

 

 

 

 

 

120/240 Volt service. (See Figures A, B and table below)

 

 

 

 

 

CONNECT HOT (L1) TO LEFT SIDE

 

Re-install front panel.

 

 

 

 

 

CONNECT GROUND TO SCREW

 

• Turn on (plug-in) electrical service to brewer.

 

 

 

 

 

CONNECT NEUTRAL (N) TO MIDDLE

 

 

 

 

 

 

CONNECT HOT (L2) TO RIGHT SIDE

• Water tank will fill after a 7-second delay. The machine will make a

 

 

 

 

 

 

Figure B

hissing sound when this occurs. On single head models, allow

 

 

 

 

 

 

 

 

 

 

 

approximately 1.5 minutes for the brewer to fill. On two head models, allow approximately five minutes for the brewer to fill.

NOTE: If water supply is inadequate or not connected, display will read “P-O” after 4 minutes of fill time (Refer to Pour-Over Mode section). If Fill Cycle times out and display reads “P-O” before tank is full, turn unit OFF then ON again to reset and continue filling.

The tank will begin heating slightly before machine fills.

Turn brewer on by pressing ON/OFF switch in front of machine. (Light will illuminate)

The brewer settings can be adjusted through the front touch pad. (Refer to Adjustments section)

The water will be hot and the brewer will be ready to brew when “READY” light illuminates.

Set Brew volume. (Refer to Setting Brew Volume section)

POWER REQUIREMENTS: (Refer to serial tag for voltage to be supplied.)
Applied VoltsModelsWattsAmpsNEMA PlugCord AWGConnections

 

 

 

 

 

 

 

 

B-3, B-3WL, B-3WR

1800

15

 

 

Hot to L1

120

 

 

 

5-15P, 5-20P for CUL

3X14

Neutral to N

B-SAP, B-ID

1780

14.9

 

 

 

Ground to ground screw

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B-3, B-3WL, B-3WR

2920

14.1

L14-20P

4X12

Hot to L1

 

 

 

 

 

B-SAP, B-ID, B-DAP, B-DGP

2620

12.6

 

Neutral to N

120/208

 

 

 

 

 

 

 

Hot to L2

B-6

5110

24.6

L14-30P

4X10

 

 

 

 

 

Ground to ground screw

 

B-DAP, B-DGP (30A)

4510

21.7

 

 

 

 

 

 

 

 

 

 

 

 

B-3, B-3WL, B-3WR

3800

15.9

L14-20P

4X12

Hot to L1

 

 

 

 

120/240

B-SAP, B-ID, B-DAP, B-DGP

3500

14.6

Neutral to N

 

 

B-6

6600

27.5

L14-30P

4X10

Hot to L2

 

 

 

 

 

Ground to ground screw

 

B-DAP, B-DGP (30A)

6000

25

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 1
Image 1
Grindmaster AMW B-Series manual Amw B-Series, Installation Start Up Procedure, Operator Manual, Water Connection, Models