OPERATOR MANUAL
AMW B-SERIES
INSTALLATION
START UP PROCEDURE
WATER CONNECTION
The National Sanitation Foundation requires the following for an NSF approved water
•A quick disconnect water connection or enough coiled tubing so that the machine can be moved for cleaning underneath.
•An approved backflow prevention device, such as a double check valve to be installed between the machine and water supply.
A 1/4” male flare adapter is provided. Installation to a water filter system is recommended to prevent lime and scale
•Water pipe connections and fixtures directly connected to portable water supply shall be sized, installed and maintained in accordance with federal, state and local codes.
• Flush the water line to purge any debris from the supply line. | For 120V, 15A or 20A Service | |
Connect a 1/4” pressurized water line to the 1/4” male connection | (2 Wire + Ground) | |
|
| |
(on rear of brewer) and turn the water supply on. |
| ON DUAL VOLT UNITS, |
|
| |
a) Minimum water pressure to the machine: 30 psi |
| FLIP SWITCH TO “120V” |
b) Maximum water pressure to the machine: 80 psi |
|
|
NOTE: Single head machines may be used without a pressurized water supply. (See
ELECTRICAL CONNECTION
L1 N L2
CONNECT NEUTRAL (N) TO MIDDLE
CONNECT HOT (L1) TO LEFT SIDE
CONNECT GROUND TO SCREW
NOTE: Wiring connections should be performed by a qualified technician. |
| Figure A | ||||||||
(Refer to serial tag to verify model number of your machine) | For | |||||||||
| ||||||||||
• Remove front panel. | (3 Wire + Ground) | |||||||||
|
|
|
|
|
|
|
|
|
| |
• Connect electrical service through rear of machine to terminal block |
|
|
|
|
| ON DUAL VOLT UNITS, | ||||
(inside front panel) marked L1, N, and L2. (See Figures A and B) |
|
|
|
|
| |||||
|
|
|
|
| FLIP SWITCH TO “120V” | |||||
• On dual volt units, flip voltage switch (inside front panel next to terminal |
|
|
|
|
|
|
|
|
|
|
block) to 120V for 120 Volt service or 240V for 120/208, or |
| L1 N L2 | ||||||||
|
|
|
|
|
|
|
|
|
| |
120/240 Volt service. (See Figures A, B and table below) |
|
|
|
|
| CONNECT HOT (L1) TO LEFT SIDE |
| |||
• |
|
|
|
|
| CONNECT GROUND TO SCREW |
| |||
• Turn on |
|
|
|
|
| CONNECT NEUTRAL (N) TO MIDDLE |
| |||
|
|
|
|
| CONNECT HOT (L2) TO RIGHT SIDE | |||||
• Water tank will fill after a |
|
|
|
|
| |||||
| Figure B | |||||||||
hissing sound when this occurs. On single head models, allow |
| |||||||||
|
|
|
|
|
|
|
|
|
|
approximately 1.5 minutes for the brewer to fill. On two head models, allow approximately five minutes for the brewer to fill.
NOTE: If water supply is inadequate or not connected, display will read
•The tank will begin heating slightly before machine fills.
•Turn brewer on by pressing ON/OFF switch in front of machine. (Light will illuminate)
•The brewer settings can be adjusted through the front touch pad. (Refer to Adjustments section)
•The water will be hot and the brewer will be ready to brew when “READY” light illuminates.
•Set Brew volume. (Refer to Setting Brew Volume section)
POWER REQUIREMENTS: (Refer to serial tag for voltage to be supplied.)
Applied Volts | Models | Watts | Amps | NEMA Plug | Cord AWG | Connections | |
|
|
|
|
|
|
| |
| 1800 | 15 |
|
| Hot to L1 | ||
120 |
|
|
| 3X14 | Neutral to N | ||
1780 | 14.9 | ||||||
|
|
| Ground to ground screw | ||||
|
|
|
|
|
| ||
|
|
|
|
|
|
| |
| 2920 | 14.1 | 4X12 | Hot to L1 | |||
|
|
|
| ||||
| 2620 | 12.6 | |||||
| Neutral to N | ||||||
120/208 |
|
| |||||
|
|
|
|
| Hot to L2 | ||
5110 | 24.6 | 4X10 | |||||
| |||||||
|
|
|
| Ground to ground screw | |||
| 4510 | 21.7 | |||||
|
|
|
| ||||
|
|
|
|
|
|
| |
| 3800 | 15.9 | 4X12 | Hot to L1 | |||
|
|
|
| ||||
120/240 | 3500 | 14.6 | Neutral to N | ||||
|
| ||||||
6600 | 27.5 | 4X10 | Hot to L2 | ||||
| |||||||
|
|
|
| Ground to ground screw | |||
| 6000 | 25 | |||||
|
|
| |||||
|
|
|
| ||||
|
|
|
|
|
|
|