Shipment Transit

1.The freezer has been operated and tested at the factory. Upon arrival the complete freezer must be thoroughly checked for any damage which may have occurred in transit.

Note: A Tip (N) Tell warning device is placed on each shipping carton at the factory. If the indicator is red, the carton has been tipped in transit. (See Figure B)

2.THE CARRIER IS RESPONSIBLE FOR ALL DAMAGE IN TRANSIT WHETHER VISIBLE OR CONCEALED. DO NOT PAY THE FREIGHT BILL until the freezer has been checked for damage. Have the carrier note any visible damage on the freight bill. If concealed damage and/or shortages are found later, advise the carrier within 10 days and request inspection. The customer must place any claim for damage and/or shortage with the carrier. Grindmaster cannot make any claims against the carrier.

Installing Your Unit

Figure B

1.Place the self-sealing rubber pad (shipped with the freezer) on a level counter that is stable and strong enough to safely support the freezer’s weight (200 lbs / 90.7 kg), or if equipped with legs instead of pad, install legs by screwing them into the four leg holes on the bottom of the unit. (Leg Kit Part # W0890220 (4) 4” Legs)

2.Make sure freezer is to be placed in a location that is within 6’ of a properly grounded circuit and allows adequate space at each side and above for proper air circulation. Air Cooled Units Only: Minimum clearance is 6” (15 cm) on both sides and 0” at back and open above the freezer. (See Figure C)

Water Cooled Units Only: 3 - 6” of clearance are required at the rear of the unit, 0” of clearance are required on both sides and open at top.

NOTE: Failure to allow adequate ventilation will void the warranty and reduceFigure C freezer performance.

NOTE: Locating the unit in high ambient temperatures (over 100°F / 37.8°C) will significantly reduce the performance of your machine.

3. Remove the side panels and supporting all four sides, lift machine up (by the frame) and place in appropriate area on top of rubber pad.

￿

CAUTION: If equipped with spinner do not lift unit up by spinner shaft. It

 

will cause serious damage to spinner.

 

 

 

 

CAUTION: Beverage freezers are heavy pieces of equipment. It is

Figure D

 

recommended that moving or lifting the unit be done by two people to

 

 

￿avoid injury.

 

4.The side panels should still be removed. Cut the cable tie used to secure motor during shipment. Make sure motor rocks freely. (Figure D)

5.Water Cooled Units Only: Connect water to inlet (3/8” flare fitting). Connect the drain line to the fitting on the out port. The out port will go to a drain or recirculating pump (reservoir with recirculating pump is recommended).

6.220V/50Hz Units: These units come with a plugless cord that requires the appropriate plug configuration be connected. This must be determined by the power outlets at the specified location. See wiring diagram at back of manual for assistance. It is recommended that a service technician performs this operation.