
Feet |
|
Four leveling feet have been included with your | |
mill/drill. However, we recommend bolting your | |
machine to a sturdy workbench. |
|
Components and Hardware Needed: | Qty |
Feet with Hex Nut | 4 |
To install the feet on the mill/drill: |
|
1.With the help of an assistant, tip the mill/drill back to gain access to the underside of the base and thread the feet into the threaded holes.
2.Place your precision level on the mill/drill table.
3.Adjust the hex nut(s) until the mill/drill is level
Figure 6.
Hex Nut
Figure 6. Leveling the mill/drill.
Mounting to |
|
Workbench |
|
The Model G0463 should be bolted to a work- | |
bench to provide maximum rigidity and safety. | |
Components and Hardware Needed: | Qty |
Hex Bolts | 4 |
Flat Washers 12mm | 8 |
Lock Washers 12mm | 4 |
Hex Nuts | 4 |
To mount the mill/drill to the workbench: |
|
1.Determine the best position for the mill/drill on the workbench.
Note: For the best performance, make sure the cross feed and the longitudinal handwheels extend out beyond the edge of the table surface. This will allow unrestricted handwheel operation.
2.Mark your hole locations using the mounting holes in the base as a guide.
3.Drill the holes needed in the workbench.
4.Place a precision level on the mill/drill table and shim the mill/drill until it is level
5.Bolt the mill/drill to the workbench.
G0463 Small Mill/Drill