GSW JW717 Chimney, Blocked Vent Safety Switch, Burner Installation, General, performed by

Models: JW527 JWF307V JW727 JWF657 JWF307 JW327 JWF507 JW517 JW317 JW717

1 20
Download 20 pages 22.68 Kb
Page 8
Image 8
Chimney

Chimney

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Be sure that the chimney is sufficiently high and large

 

 

 

 

 

 

 

 

 

 

SWG II 4HD

enough to meet the specifications of the burner unit

 

 

 

 

 

 

CK SERIES

 

 

POWER

 

 

 

 

 

 

 

 

 

VENTER

 

installed. Check that there is sufficient draft for the proper

 

 

 

 

 

CONTROL KIT

 

 

 

 

burning of oil. At least -0.015 in. (-0.381mm) water column

 

 

 

 

 

 

 

 

 

 

 

 

of over-fire draft is recommended.

 

 

 

 

 

 

 

 

 

 

 

 

Blocked Vent Safety Switch

 

 

 

 

 

 

 

DRAFT

 

 

 

 

Oil-fired water heaters installed in Canada must be fitted

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

REGULATOR

 

 

 

 

with the blocked vent safety switch supplied with your

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

heater. The installation procedure is given below. For further

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

details and information refer to the instruction sheet supplied

 

 

 

 

SEE MANUFACTURER’S

 

 

with the switch. (Not required for JWF307V.)

 

 

 

 

 

 

INSTRUCTIONS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Installation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1. Pierce a 16mm (5/8 in.) dia. hole into the flue pipe

 

 

 

 

 

 

 

OIL FIRED

 

 

 

 

305mm to 457mm (12 to 18 in.) from the breech con-

 

 

 

 

 

 

 

WATER

 

 

 

 

 

 

 

 

 

 

 

HEATER

 

 

 

 

nection of the water heater. Remove one of the securing

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

nuts from the pipe of the safety switch. Tighten the other

 

 

 

 

 

 

 

 

 

 

 

 

securing nut onto the pipe as far as possible.

 

 

 

 

 

 

 

 

 

 

 

 

2. Insert the threaded pipe end into the pierced hole, then

 

 

 

 

 

 

 

 

 

 

 

 

install the securing nut, which was removed in step 1,

 

 

 

 

 

 

 

 

 

 

 

 

and tighten securely.

 

 

 

 

 

 

 

 

 

 

 

 

CAUTION:: Turn "OFF" the electrical supply to the water

 

 

 

 

 

 

 

 

 

 

 

 

heater when wiring safety switch.

 

 

 

 

 

 

 

 

 

 

 

 

3. Wire the safety switch in series with L1 of the electrical

 

 

 

 

 

 

 

 

 

 

 

 

supply (see Figures 9, 10 & 11). Install and route wiring

 

 

 

 

 

 

 

 

 

 

 

 

in an accordance with “Canadian Electrical Code Part

 

 

 

 

 

 

 

 

 

 

 

 

1 (C22.1)” and any applicable local codes.

 

 

 

 

 

 

 

 

 

 

 

 

CAUTION: If for any reason the system has shut down dur-

Figure 6 POWER VENTING

 

 

 

 

ing operation, the cause of the system failure should be

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Burning Equipment (NFPA 31)”, local codes and the man-

investigated and corrected before resetting the safety switch

ufactures instructions should be adhered to in all installa-

and re-starting the system.

tions of the water heaters and power venters. A draft regula-

 

 

 

 

WHEN MODEL JWF307 IS TO BE FIRED AT

 

tor must be used in conjunction with the installation of the

THE MAXIMUM RECOMMENDED RATE OF

 

power venter (see “Draft Regulator”). Consult the applicable

0.75 GPH, THE FLUE BAFFLE MUST BE

 

 

codes to calculate total equivalent vent pipe length, the

ALTERED AS IN THE DIAGRAM. BOTH HALF

 

DISCS MUST BE BENT FLAT AGAINST THE

 

straight runs of pipe and the equivalent length of pipe for

BODY OF THE BAFFLE.

 

each fitting.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

THIS IS REQUIRED TO ALLOW FLUE GAS

 

 

 

 

 

 

 

 

 

 

 

 

 

PASSAGE AT THE HIGHER FIRING RATE.

 

Burner Installation

 

 

 

 

 

 

 

 

 

 

 

 

General

 

 

 

 

 

 

 

 

 

 

 

 

 

The installation of these units shall be in accordance with

 

 

the “Installation Code for Oil-Burning Equipment (CSA

 

 

B139-04)” or “Standard for the Installation of Oil-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WARNING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 5 BAFFLE MODIFICATION (JWF307)

 

This installation must be

performed by

a

 

qualified Oil-Burner Technician in accor-

 

 

Power Venting

dance with these instructions and diagrams.

Models JWF307, JWF507 and JWF657 may be power vent-

The installation and maintenance of the

ed with a Field SWGII 4HD Power Venter. The following con-

water heater must follow all of the instruc-

trol kits may be used with the SWGII 4HD:

tions in preceding sections of this manual.

CK 61 Electronic Post Purge.

Improper

installation can

cause

injury

or

CK 62 Thermally Activated Post Purge.

property

damage. Heater

failure

that is

a

Installation of Power Venter

result of the heating system is not covered

The “Installation Code for Oil-Burning Equipment (CSA

B139-04)” or “Standard for the Installation of Oil-

by warranty.

 

 

 

 

– 8 –

Page 8
Image 8
GSW JW717 Chimney, Blocked Vent Safety Switch, Burner Installation, General, This installation must be, performed by