14
Installation Manual For Indoor Unit

a

b

c

d

e

f

g

h

i

Fig 2
After selecting the unit installation location, proceed the following steps:
1. Drill a hole in the wall and insert the connecting pipe and wire through a PVC
wall-through tube purchased locally. The wall hole shall be with a outward down
slope of at least 1/100. (See Figure 2)
2. Before drilling check that there is no pipe or reinforcing bar just behind the drilling
position.
Drilling shall avoid at positions with electric wire or pipe.
3. Mount the unit on a strong and horizontal building roof. If the base
is not firm, it will cause noise, vibration or leakage.
4. Support the unit firmly.
5. Change the form of the connection pipe, connection wire and drain
pipe so that they can go through the wall hole easily.
Unit model a
1002
538
b
483.5
483.5
c
131
131
d
1105
610
e
255
255
f
105
105
g
880
418
h
970
508
i
220
220
For series 142
For series 182 242