Haier HSU-18HEA03/R2-I, HSU-09HEA03/R2-I Outdoor unit, Purging Method To use vacuum pump

Models: HSU-18HEA03/R2-I HSU-12HEA03/R2-I HSU-09HEA03/R2-I

1 13
Download 13 pages 46.02 Kb
Page 8
Image 8
5.Purging Method:To use vacuum pump

Outdoor unit

5.Purging Method:To use vacuum pump

Liquid Side

 

6.35mm(1/4")

 

2-way valve

Gas Side Manual background 9.52mm(3/8") 12.7mm(1/2")

3-way valve

Detach the service port's cap of 3-way valve, the valve rod's cap for 2-way valve and 3-way's, connect the service port into the projection of charge hose (low) for gaugemanifold. Then connect the projection of charge hose (center) for gaugemanifold into vacuum pump.

Open the handle at low in gaugemanifold, operate

Tube(for R410A)

Gaugemanifold(for R410A)

Manual backgroundManual background Anti countercurrent joint

Vacuum pump(for R410A)

vacuum pump. If the scale-moves of gause (low) Manual backgroundManual background Open

reach vacuum condition in a moment, check Manual background again.

Vacuumize for over 15min. And check the level gauge which should read -0.1 MPa (-76 cm Hg) at low pressure side. After the completion of vacuumizing, close the handle 'Lo' in gaugemanifold and stop the

operation of the vacuum pump.Manual background Close Check the condition of the scale and hold it for 1-2min.

If the scale-moves back in spite of tightening, make

flaring work again, the return to the beginning of Manual background .

Open the valve rod for the 2-way valve to an angle of

 

 

 

 

Liquid Side

Gas Side

 

 

 

 

6.35mm(1/4")

9.52mm(3/8")

anticlockwise 90 degrees.

 

 

 

 

2-way valve

3-way valve

 

12.7mm(1/2")

After 6 seconds, close the 2-way valve and make

 

 

Service port

 

3-way valve

the inspection of gas leakage.

Open

2-way valve

90

o

for 6 sec.

 

 

 

 

90o

 

 

 

In case of gas leakage, tighten

No gas leakage? Manual background parts of pipe connection. If leakage stops, then proceed Manual background

steps.

Detach the charge hose from the service port, open

2-way valve and 3-way. Turn the valve rod anticlockwise until hitting lightly.

To prevent the gas leakage, turn the service port's cap, the valve rod's cap for 2-way valve and 3-way's a little more than the point where the torque increases suddenly.

After attaching the each caps, check the gas leakage around the caps.

CAUTION:

1.If the refrigerant of the air conditioner leaks, it is necessary to discharge all the refrigerant. Vacuumize first, then charge the liquid refrigerant into air conditioner according to the amount marked on the name plate.

If it does not stop gas leakage, discharge whole refrigerants from the service port. After flaring work again and vacuumize, fill up prescribed refrigerant from the gas cylinder

3-way valve

2-way valve

2-way valve

3-way valve

 

Manual background Valve rod cap

Service port cap Manual background Valve rod cap

2.Please do not let other cooling medium, except specified one (R410A),

or air enter into the cooling circulation system. Otherwise, there will be

abnormal high pressure in the system to make it crack and lead to

personal injuries.

Page 8
Image 8
Haier HSU-18HEA03/R2-I, HSU-09HEA03/R2-I, HSU-12HEA03/R2-I Outdoor unit, Purging Method To use vacuum pump