Haier QBJ1-230A58E, QBJ1-130A58E, QBJ1-270A58E manual Tank assembly, Frame assembly, Frame fastness

Models: QBJ1-130A58E QBJ1-175A58E QBJ1-270A58E QBJ1-150A58E QBJ1-200A58E QBJ1-230A58E

1 16
Download 16 pages 27.98 Kb
Page 8
Image 8

Assembly Instruction

Tank assembly

1.Unpacking the tank, rip off the protection film. Uninstall the nut and cushion.

2.Place tank onto tank bracket cradle, inserting protruding bolts into holes. fasten with nuts.

Notice:

1.Rip off the protection film after the installation to avoid the destroy of the tank, and please don't use the sharp tool.

2.Leave nuts loose since some adjustment may be necessary after fitting tubes.

3.When assembling the water tank, keep the center line of vacuum tubes connecting holes parallel with the diagonal pillar of bracket.

Frame assembly

Please consult the accessional paper for figure of the frame and packing list in the packing of frame.

Frame fastness

1.Peg the feet of the heater into the earth with prepared iron or into the concrete brick with intumescent bolt.

2.Adjust the height of the frame with the water-proof cushion to keep the tank aclinic and each foot balanceable.

Notice:

1.Make sure that the feet are all attach the floor closely, or it will cause the distortion of the frame.

2.Please use the tight wire to fasten the tank and frame in the area that the typhoon occurred frequently.

3.The installation of the solar water heater should be steadily or it will cause the destruction and the accident.

5

Page 8
Image 8
Haier QBJ1-230A58E, QBJ1-130A58E, QBJ1-270A58E, QBJ1-200A58E, QBJ1-175A58E manual Tank assembly, Frame assembly, Frame fastness