Technical Information

Recommended water pressure

14.7 - 72.5 psi

Max. water pressure

147 psi

Recommended hot water temp.

120- 140F*

Max. hot water temp

165F*

Hole size in mounting surface

1

1/4” valves, 1 3/8” spout

Max. mounting surface depth

1

1/2”

Flow rate

2.2 gpm

Requires 1/2” supply lines (not included)

 

 

*Please know and follow all applicable local plumbing codes when setting the temperature on the water heater. In Massachusetts, the water heater may be set no higher than 112oF.

Installation

Install the hot and cold valves

Install the mounting nut, metal washer and the fiber washer on the valve.

Insert the valve through the hole in the deck. The hot valve is marked with a red dot.

Install the stop ring on the valve. Thread the mount- ing plate on the valve until the stop ring stops it at the proper height.

Rest the valve on the mounting surface. Turn the valves so that the outlets point toward the center.

Tighten the mounting nut. Tighten the tensioning screws.

Install the spout

Swing C and Limbo C only: Place the spout, deco ring, and sealing ring on the mounting surface.

All other models: Place the spout and sealing ring on the mounting surface.

Page 3
Image 3
Hans Grohe 06119XX0, 06577XX0 Technical Information, Installation Install the hot and cold valves, Install the spout