SKU 04041 For Technical Questions, Please Call 1-800-444-3353 Page 7
OPERATION
NOTE: For additional references to the parts listed below, refer to the Assembly
Diagram on page 11.
REV 01/04
3. Orient a strip of nails with the points down, and drop the strip of nails into the
Magazine (part #71). (See Figure C.)
4. Slide the strip of nails forward in the Magazine (part #71). NOTE: The Magazine
will hold 60, 10 gauge nails.
(See Figure C.)
5. Unlatch the Feeder Shoe (part #52), and allow the Feeder Shoe to slide forward
against the strip of nails. (See Figure C.)
1. Adjust the Exhaust Cover (4) to direct exhaust as desired.
2. To fire a nail, place the nose of the Nailer on the workpiece. The Nailer should not
fire if the Safety (38) is not depressed. Once the Safety is depressed, gently
and briefly squeeze the Trigger once to fire one nail. Release the Trigger. Do
not fire repeatedly; nails could bounce off on one another, damaging the
workpeice or causing personal injury.
3. With the nose of the Nailer on the workpiece, squeeze the Trigger again to
fire another nail. Continue firing nails as needed.
4. When the work is completed, disconnect the air supply and remove the nails from
the nailer.
Loading Nails (continued)