2.Connect
3.Drape Tarp (7) over assembled frame and secure the corners (first) onto the frame using the Ball Tie Downs (4) as shown in 4A, B, and C, below.
4.Once the corners are fastened, place the Ball Tie Downs through the balance of the metal eyelets as shown in the previous illustration, 4D.
5.Lift one side of the roof and slide in four Steel Tubes (1). Line up the holes in the Tubes with the holes in the Fittings and insert
REV 02/05
SKU 40544 | For technical questions, please call | Page 4 |