Harbor Freight Tools 93442 manual Symbology, Unpacking, Assembly And Operating Instructions, V~ A

Models: 93442

1 14
Download 14 pages 48.23 Kb
Page 9
Image 9
SYMBOLOGY

SYMBOLOGY

V~

A

noxxxx/min.

Double Insulated

Canadian Standards

Association

Underwriters

Laboratories, Inc.

Volts Alternating Current

Amperes

No Load Revolutions per Minute (RPM)

FIGURE E

UNPACKING

When unpacking, check to make sure all the parts shown on the Parts List on page 13 are included. If any parts are missing or broken, please call Harbor Freight Tools at the number shown on the cover of this manual as soon as possible.

ASSEMBLY AND OPERATING INSTRUCTIONS

NOTE:

For additional information regarding the parts listed in the following pages, refer to the Assembly Diagram on page 13.

WARNING: Drowning hazard; keep out of small children’s reach.

CAUTION! Always make sure the Pump (9) is disconnected from its electrical outlet prior to assembling the Fountain, adding any water, or performing service to the product.

Assembly Instructions:

1.NOTE: Assembly will require the assistance of another person.

2.Place the Bottom Stand (1) in the location where the Fountain is to be used.

(See Assy. Diagram.)

3.Attach the Vertical Stand (2) to the Bottom Stand (1). (See Assy. Diagram.)

4.Attach the Middle Stand (3) to the Vertical Stand (2) and Bottom Stand (1).

(See Assy. Diagram.)

SKU 93442 For technical questions, please call 1-800-444-3353 PAGE 9

Page 9
Image 9
Harbor Freight Tools 93442 manual Symbology, Unpacking, Assembly And Operating Instructions, Assembly Instructions, V~ A