Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev B. • 10/08 57
Note: All
measurements
in inches.
MEASUREMENTS FROM
TOP EDGE OF THE OPENING
5
10
11
12
2-1/2
13 14
1516 17 18 19
32
TO CEILING
9101112
8
7
6
5
4
3
25
18
See-Through Mantel ProjectionPIER/LCOR/RCOR Mantel ProjectionNote: All
measurements
in inches.
MEASUREMENTS FROM
TOP EDGE OF THE OPENING
5
10
11
12
1
13 14
15 16 17 18 19
32
TO CEILING
910 11 12
8
7
6
5
4
3
25
18
B. Mantel and Wall ProjectionsWARNING! Risk of Fire! Comply with all minimum clear-
ances as specifi ed. Framing closer than the minimums list-
ed must be constructed entirely of noncombustible materi-
als (i.e., steel studs, concrete board, etc.) Failure to comply
could cause fi re.
Figure 13.12 Minimum Vertical and Maximum Horizontal
Dimensions of Combustibles
Figure 13.13 Minimum Vertical and Maximum Horizontal
Dimensions of Combustibles
MEASUREMENTS FROM
TOP EDGE OF THE OPENING
10
11
12
18
9
8
7
61234
56
12
32
MAX.
MIN.
TO CEILING
MEASUREMENTS FROM
TOP EDGE OF THE OPENING
4
32
8
9
10
12
7
6
678
910
12
MAX.
MIN.
TO CEILING
Note: All
measurements
in inches.
Note: All
measurements
in inches.