MAIN DUCT K IT INSTALLATION G UIDE

PT AC PREPA RATION

WALL SLEEVE PREPARA TION

1. Examine PTAC front cover. Cover ma y be secured by a screw(s). If p resent, screw s can be rem oved through the f ront intake l ouvers.

2.Remove the cover from the chassis by pulling on the bottom of t he cover away from the chassis until the retaining clips disengage (1). Then lift u p (2)

3.Disassemble the existing discharge grille from the front cover by removing the screws.

4.Set the cover aside for lat er re‐installation.

5.After ensurin g ALL power sources ar e off, unplug and remove chassis from wall sleeve. Set chassis aside for later re‐installation.

1. Mark and drill two (2) 9/ 32” holes on the right an d left of the W all Sleeve in locations as shown belo w. ( Right hand sh own). If clearances do not allow, layo ut and drill holes from the inside of the W all Sleeve.

2.Install the two Mounting Brackets provided as shown in the figure b elow.

© 2002‐2011 M.S.CHOH AN. Duplication i n whole or in part is prohibited.

Page 3 of 6