Heat Controller CDG SERIES General, Codes & Regulations, Inspection Upon Unit Arrival, Clearances

Models: CDG SERIES MDG SERIES

1 13
Download 13 pages 23.98 Kb
Page 5
Image 5
3.0 General

Heat Controller, Inc.

INSTALLATION INSTRUCTIONS

Cased/Uncased Coils

3.0 General

The unit can be positioned for bottom return air in the upflow position, left and right return in the horizon- tal position, top return in downflow position.

3.1 Codes & Regulations

This product is designed and manufactured to comply with national codes. Installation in accordance with such codes and/or prevailing local codes/regulations is the responsibility of the installer. The manufac- turer assumes no responsibility for equipment installed in violation of any codes or regulations.

The United States Environmental Protection Agency(EPA) has issued various regulations regarding the introduction and disposal of refrigerants. Failure to follow these regulations may harm the environment and can lead to the imposition of substantial fines. Should you have any questions please contact the local office of the EPA.

3.2 Inspection Upon Unit Arrival

As soon as unit is received, it should be inspected for possible shipping damage during transportation. It is carrier’s responsibility to cover the cost of shipping damage. Manufacturer or distributor will not accept a claim for any transportation damage.

3.3 Clearances

Clearances should be provided for the following during installation

a.Maintenance and service access, including coil cleaning and coil assembly removal b.Refrigerant piping and connections

c.Condensate drain line

4

Page 5
Image 5
Heat Controller CDG SERIES General, Codes & Regulations, Inspection Upon Unit Arrival, Clearances, Heat Controller, Inc