Heath Zenith SL-5407 manual Installation, White to White, Wire the Light Control, Black to Black

Models: SL-5407

1 12
Download 12 pages 2.94 Kb
Page 2
Image 2
INSTALLATION

INSTALLATION

For under eave installation, the sensor head must be rotated as shown in the next two steps for proper operation and to avoid the risk of elec-

After screwing the sensor into the wall plate, connect the junction box wires to the light control wires by twisting together and securing with wire connectors.

trical shock.

For eave mount only:

Swing the sensor head towards the clamp

screw.Controls Clamp Screw White to White

White to White

Junction

Box

Red Sensor Wire to

Black Lamp Wire

Lamp

Holders

Rotate the sensor head clockwise 180° so the controls face down.

Controls

Wire the Light Control Controls

If the sensor pops out of the ball joint, loosen the clamp screw and push the sensor back into the ball joint. Tighten the clamp screw when done.

These instructions show the sensor wired to flood- lamps.The white sensor wire is neutral.The black sensor wire is hot. The red wire is the switched "hot" wire. The lighting load (500 W, 4.2A max) is placed across the white and red wires.

Wire the Light Control

 WARNING: Turn power off at the fuse or circuit breaker. WARNING: Turn power off at the fuse or circuit breaker.

Remove the existing light fixture, if present.

Black to Black

Optional: Connect additional load across the white and red wires. Total lighting load including lampheads on fixture must not exceed 500W (4.2A).

Mount the Light

Follow the instructions that came with your light fixture for mounting and adjusting the light fix- ture.

Keep regular PAR-38 lamps at least 1" (25 mm) from the sensor. Halogen lamps should be kept at least 2" (51 mm) from the sensor.

- -

595-5544-06

Page 2
Image 2
Heath Zenith SL-5407 manual Installation, White to White, Wire the Light Control, Black to Black, Mount the Light