Raypak 133-4001 manual Vent Damper Installation, Models 133 Through 261 Where Required Location

Models: 133-4001

1 44
Download 44 pages 48.9 Kb
Page 15
Image 15
Vent Damper Installation

Vent Damper Installation

(Models 133 Through 261) Where Required

Location

The vent damper must be located in the vent so that it serves only the appliance for which it is intended.

If improperly installed, a hazardous condition, such as an explosion or carbon monoxide poisoning, could result. Make certain that it is mounted in an accessible location at least 6 inches from any combustible mate- rial or the heat exchanger, and that the position indicator is in a visible location.

The vent damper must be installed after the appliance

On vertical vents, the vent damper may be mounted with the actuator in any position. On horizontal vents, do not mount the actuator either directly above or directly below the vent pipe; mount the vent damper actuator to the side of the vent.

The vent damper is set up for a continuous pilot sys- tem. If the vent damper is installed on an Intermittent Pilot or Direct Spark Ignition equipped system, the energy savings of the vent damper can be improved by plugging the hole in the vent damper blade using the knockout plug, Part No. 105612R, provided in the parts envelope.

DO NOT plug the hole if installing the vent damper on a continuous pilot system as this will create a hazard.

HORIZONTAL INSTALLATION

drafthood, as close to the drafthood as practicable, and without modification of the drafthood.

FLOW >

TO BOILER

D80B

VERTICAL INSTALLATION

TO CHIMNEY

TO CHIMNEY

NO

YES (Models 133 Through 261) Where RequiredYES

NO

INSTALL VENT DAMPER WITH ACTUATOR TO SIDES OF VENT ONLY. DO NOT MOUNT ABOVE OR BELOW VENT.

ACTUATOR MAY BE INSTALLED IN ANY POSITION ON VERTICAL PIPE

VENT DAMPER

TO BOILER

Fig. 17: Vent Damper Installation (Model 133 Drafthood

Shown)

WARNING: Do not use thermally actuated vent dampers on a modulating boiler. To do so may result in asphyxiation. Use only a mechanically actuated vent damper device that is electrically interlocked with the modulating boiler operation.

Fig. 18: Horizontal/Vertical Vent Damper Installation

 

 

D80B

 

 

 

 

N. O.

N. C.

 

 

 

 

 

END

1K2

 

 

 

 

SWITCH

 

 

 

 

 

 

 

 

 

 

C.

1K1

 

 

 

 

 

 

 

 

 

 

 

 

 

R

 

 

 

1K3

 

 

 

 

 

 

 

1R

 

 

 

 

 

1

2

3

4

5

 

BLACK

ORANGE

RED

YELLOW

BLUE

 

 

 

 

 

 

LIMIT

OPTIONAL LIMIT

 

 

 

 

 

 

LOCATION

 

 

THERMOSTAT OR

 

 

L1

 

 

CONTROLLER

 

 

 

 

 

 

 

 

 

 

 

 

 

(HOT)

 

 

DUAL VALVE

 

 

 

L2

 

 

COMBINATION

 

 

1

 

 

GAS CONTROL OR

 

TRANSFORMER

 

 

 

 

 

 

IGNITION SYSTEM

 

 

 

1

POWER SUPPLY PROVIDE DISCONNECT MEANS AND OVERLOAD PROTECTION AS REQUIRED

Fig. 19: Vent Damper General Wiring Diagram

15

Page 15
Image 15
Raypak 133-4001 manual Vent Damper Installation, Models 133 Through 261 Where Required Location, Horizontal Installation