Raypak 133-4001 manual Indoor Installations, Models, Detail A, Detail B, Jacket Top, Screw

Models: 133-4001

1 44
Download 44 pages 48.9 Kb
Page 10
Image 10
JACKET TOP

1.Remove jacket top panel.

2.Remove and discard inner stack adapter panel.

3.

Install jacket top panel.

JACKET TOP

4.

Insert tabs of outdoor top into keyholes located on

 

 

jacket top panel (4 places). See Detail A.

 

5.

Snap tabs on outdoor top into the locked position

 

 

of the keyhole so the top will not pull out. See

FASTENING

 

Detail B.

SCREW

Detail A

Detail B

Outdoor Top

(Shipped Loose with Heater)

Fig. 6: Installing Outdoor Top—Models 181-401 & 182-

400

Models 514-824

1.Lower outdoor top onto unit. Position top so it is centered on unit from side to side and front to rear.

Fig. 8: Installing Outdoor Top Detail—Models 514–824

Models 926-1758

Boilers are shipped with outdoor vent terminal factory installed.

Indoor Installations

Model 133

1.Shut-off main electrical power switch to boiler.

2.Turn heater manual switch located in upper control panel to the "OFF" position.

3.Shut-off gas supply and water supply to the boiler.

4.Mount drafthood on boiler and attach with the sheet metal screws provided. Drafthood should be positioned with the vent sensor located on the front left side (see next page).

5.Remove plastic plug from left side of boiler jacket and install the plastic grommet provided.

6.Route flue sensor wire harness through the grom- met installed in Step 5.

7.Remove door and locate wire from roll-out sensor to high limit with the male/female connector.

8.Disconnect male/female connector and attach to the 2 wires from drafthood vent sensor harness.

Fig. 7: Installing Outdoor Top—Models 514–824

2.Tighten the (4) screws (as indicated in Fig. 8) until they come in contact with the unit jacket top, then evenly tighten all (4) screws to secure to unit.

10

Page 10
Image 10
Raypak 133-4001 manual Indoor Installations, Models, Detail A, Detail B, Jacket Top, Screw