RECEIVING EQUIPMENT
On receipt of the equipment, visually check for exter- nal damage to the carton or the shipping crate. If either is damaged, make a note on the Bill of Lading and report the damage to the Carrier immediately. Remove the boiler from the carton or the shipping crate.
On occasion, items are shipped loose. Be sure that you receive the number of packages indicated on the Bill of Lading.
When ordering parts, you must specify the Model and Serial Number of the boiler. When ordering under war- ranty conditions, you must also specify the date of installation.
Raypak recommends that this manual be reviewed thoroughly before installing your Raypak boiler. If there are any questions which this manual does not answer, please contact the factory or your local Raypak repre- sentative.
Claims for shortages and damages must be filed with carrier by consignee. Permission to return goods must be factory authorized and are subject to a stocking charge.
Purchased parts are subject to replacement only under the manufacturer's warranty. Debits for defec- tive replacement parts will not be accepted and will be replaced in kind only per our standard warranties.
CERTIFICATIONS
The Raypak hydronic boilers are design certified and tested under the latest requirements of the American National Standard, ANSI Z21.13. Each boiler has been constructed and pressure tested in accordance with the requirements of Section IV of the American Society of Mechanical Engineers Code, and factory fire tested.
All models are National Board approved. Temperature and pressure gauge is standard. Model 0133 has a 4- pass heat exchanger, 1 tube per pass. Models
All units are
BOILER TYPES
Type H1 - Mechanical Modulating, Models 133-1826
Central heating boiler with
Type H2 - Motorized Modulating, Models 514-4001
Central heating boiler with a motorized modulating gas valve. Modulating controller optional.
Type H3 - 2-Stage Controls, Models 181-4001
Central heating boiler with single
Type H4 - On-Off Controls, Models 181-4001
Central heating boiler with
Type H5 - Mechanical Modulating, Models 181-1826
Central heating boiler with
Type H9 - 4-Stage, Models 514- 4001
Central heating boiler with
INSTALLATION
Installation Codes
The installation must conform with these instructions and the latest editions of the National Fuel Gas Code ANSI Z223.1, the National Electric Code ANSI/NFPA 70 and local codes. In Canada installations must con- form with the current CAN/CSA B149 and the Canadian Electrical Code CSA C22.1 C.E.C. Part 1 (C22.1). All boiler installations must conform to ASME boiler code. Hot water pipes must be installed with minimum clearances to combustible material as required by code.
6