START-UP

T & P GAUGE (NOT SHOWN)

INLET

MECHANICAL

MODULATING

 

 

GAS VALVES WITH

HI-LIMIT

REGULATOR

 

Fig. 37: General Location of Controls

START-UP

Ethylene Glycol Systems -

Before Start-Up

Heating Boilers

Fill through filler opening on the top on the Air-X Tank

 

Safe lighting and other performance criteria were met

to solution desired. Always maintain solution level in

sight glass.

with the gas manifold and control assembly provided

 

on the boiler when the boiler underwent tests specified

 

in the latest edition of ANSI Z21.13 Standard.

NOTE: Raypak recommends the use of Ethylene

General

Glycol solution only.

 

 

Before lighting up a new installation, water should be

 

Initial Start-Up - Pump and

flowing through the boiler. Regulator should be set to

 

Motor

minimum 12 PSI.

 

 

 

 

Many pumps are now direct-drive. They have no cou-

CAUTION: Propane gas is heavier than air and

 

pler or bearing assembly. These pumps do not require

sinks to the ground. Exercise extreme care in light-

 

lubrication. Others require SAE-30 non-detergent oil to

 

lubricate both the motor and the bearing assembly.

ing boiler in confined areas.

 

 

Check pump motor for type before attempting to oil.

 

 

Filling System - Heating

 

Clean dust and lint from pump and motor. Check pump

Boilers

 

coupler and tighten if necessary. Flush system before

 

 

 

 

putting into operation to ensure that foreign material

Fill system with water. Purge all air from the system

 

does not damage pump seals.

 

 

using purge valve sequence. After system is purged of

 

 

air, lower system pressure. Open valves for normal

 

CAUTION: Pump must be off to check oil in bearing

system operation. Fill system through feed pressure.

 

assembly. Do not run pump without water in system.

Manually open air vent on the compression tank until

 

 

 

 

water appears, then close vent.

 

 

 

 

 

 