8
4 Set Up and Operation

4.2 Operation

Fluid output can be regulated individually. Apply needle regulator with counter
nut 15 for quantity of fluid flow.
Turning needle r egulator right: less fluid flow.
Turning needle regulator left: more fluid flow.
Pull trigger at the valve body 4. Spray operation starts.
You will notice that you receive so called “pre-air” prior to opening fluid flow when
pulling the trigger. When releasing trigger you still have “purging-air” after needle
has closed, nozzle and fluid flow Has stopped. This prevents that the fluid forms
drops instead of the desired atomization.

4.3 Shutdown

Hold up the finespray applicator.
Depressurize the pressure pot.
The mold release agent flows back into the pressure pot.

4.4 Return to Operation

Pressurize the pressure pot.
Pull trigger at the valve body 4. Spray operation starts.
The feedline will be filled.