On/Off Switch

Removal

1.

Relieve pressure; page 4.

2.Fig. 11. Remove five screws (307) and cover (322).

Installation

1.Install new ON/OFF switch (309) so tabs of switch snap into place on inside of pressure control housing.

3.Disconnect two wires (A) from ON/OFF switch (309).

4.Press in on two retaining tabs on each side of ON/OFF switch (309) and remove.

2.Connect two wires (A) to ON/OFF switch.

3.Install pressure control cover (322) with five screws (307).

307

313

1

310

 

309 A

315

319

318a

301

302

303

322

D

318z

 

 

318aa

 

 

 

 

 

E

 

 

 

1 Locate switch terminals as shown

8711A

Fig. 11

 

 

 

 

308864 11

Page 11
Image 11
Hitachi 232624 dimensions On/Off Switch, Remove five screws 307 and cover