Hobart 4246 manual Installation, Unpacking, Location, Leveling, Lubrication

Models: 4246

1 8
Download 8 pages 44.73 Kb
Page 4
Image 4
INSTALLATION

INSTALLATION

UNPACKING

Immediately after unpacking the mixer-grinder, check for possible shipping damage, If the mixer- grinder is found to be damaged, save the packaging material and contact the carrier within 15 days of delivery.

Remove the packing box by loosening and removing the four bolts through the wooden skid.

To set up the unit, follow the order of assembly below:

1.Legs, shipped in a separate box from the unit, require a 15/16" socket with torque to 50 ft-lb.

2.Lower side panels are packed on top of unit.

3.Remove the spanner wrench and the meat deflector, located inside the hopper.

4.Pneumatic foot switch, if ordered, is shipped in a separate box.

Already assembled within the unit are the conveyor screw, mixing arm and cylinder. Remove the shipping plate and rubber spacer from the chopping end and replace with your #32 knife and plate assembly, not supplied.

LOCATION

Prior to installing the mixer-grinder, verify the electrical supply to make sure that it agrees with the specifications on the machine data plate, which is located under the hopper on the right.

LEVELING

Level the mixer-grinder, both front-to-back and side-to-side, by loosening the two set screws on the caster/leg shaft. Tighten both set screws when level.

LUBRICATION

The mixer-grinder is shipped with oil already installed. If oil loss is observed, the oil levels of both transmissions should be checked prior to operation. Contact a local Hobart Service Office.

– 4 –

Page 4
Image 4
Hobart 4246 manual Installation, Unpacking, Location, Leveling, Lubrication