63
Handle Installation
TORQUE:
RIGHTHANDLE
BRACKET
LEFTHANDLE BRACKET
8 16mm FLANGE BOLT (4)
LEFTUPPER HANDLE ASSY
RIGHTUPPER HANDLE ASSY
Install the right and left handles on the generator upper frame using
the handle brackets and four flange bolts.
17 22 lbf·ft (24 29 N·m , 2.4 3.0 kgf·m)
09/02/10 12:53:50 31Z21600_064