Completing the Installation
1)When the preceding steps have been completed for all desired circuits, the EmerGen Switch white (neutral) wire(s) needs to be installed.
a.Select any unused hole on the neutral bar in the load center.
b.Cut and strip the wire appropriately. Insert the wire into the hole and tighten securely.
2)The EmerGen Switch green (ground) wire(s) needs to be installed into an unused hole in the ground bar in the load center.
a.Select an unused hole in the ground bar in the load center.
b.Cut and strip the wire appropriately. Insert the wire into the hole and tighten securely.
3)Replace the load center cover. All circuit breakers can now be turned on including the MAIN circuit breaker.
4)All EmerGen switches should be in the “Line” position. The “Off” position is generally not used.
5)Fill out the chart supplied with your EmerGen Switch describing each emergency circuit and corresponding circuit breaker. Place this label on or near your EmerGen Switch for easy reference.
EmerGen Switch
EGS |
| Circuit No. |
| Circuit |
Circuit |
| at Load Center |
| Description |
A |
| 8A |
| Freezer |
B |
| 5B |
| Rec Room Lights |
C |
| 2A |
| Barn Pump |
D3A
E |
| 4B |
| Lights |
F | 10B |
| Furnace Fan |
6