69-1726—1 4
Step 1. Prepare for Installation (Cont)
2. Check that you have everything required for the
installation:
Two AA alkaline batter ies
No. 2 Phillips screwdriver and standard pocket
screwdriver
•Drill
Drill bit—use 3/16 in. for drywall; use 7/32 in. for
plaster
Level (optional)
• Hammer
•Pencil
Electrical tape