Hotpoint HTS93G manual Fix the flue support bracket to the wall with two 5 x 45 mm screws

Models: HTS93G

1 8
Download 8 pages 12.22 Kb
Page 3
Image 3
5.Fix the flue support bracket to the wall with two 5 x 45 mm screws.

Preliminary information for installing the hood: Disconnect the power supply at the domestic main switch before carrying out electrical connections. Remove the grease filter/s.

1.Using a pencil, draw the centre line on the wall up to the ceiling to facilitate installation operations.

2.Apply the drilling template to the wall: Align the vertical centre-line on the drilling template with the centre-line drawn on the wall. The template’s bottom edge represents the bottom edge of the hood.

3.Place the lower support bracket on the hole diagram so that it matches the dotted rectangle, mark the two external holes and drill.

Note: Drill all the holes indicated on the template: the top 2 holes are for hanging the hood and the bottom holes (generally 1 central or 2 side holes) are for fixing it securely to the wall.

Remove the hole diagram, insert the wall plugs and fix the hood support bracket with two 5 x 45 mm screws.

4.Fit the flue support bracket “G” to the wall and against the ceiling, use the support bracket as a hole diagram (if present, the small slot on the support must match the line drawn on the wall ), mark 2 holes with the pencil then drill the holes (Ø 8 mm) and finally insert 2 plugs.

5.Fix the flue support bracket to the wall with two 5 x 45 mm screws.

6.Hook the hood to the lower bracket.

7.Adjust the distance between the hood and the wall.

8.Adjust the hood horizontally.

9.Fix the hood securely to the wall (ABSOLUTELY NECESSARY!!).

10.Connect an exhaust pipe (pipe and clamps are not supplied and must be bought separately) to the collar located above the extraction motor unit.

For extractor operation, connect the other end of the exhaust pipe to the home discharge device. For filter operation, fix the deflector F to the flue support bracket G and connect the other end of the exhaust pipe to the deflector collar F.

11.Insert the steam deflector and secure it to the supports (11b) on the extractor unit with 2 bushings and 2 screws (11a).

12.Make all necessary electrical connections.

13.Fit the flues over the extractor unit, engaging them in their seat above the hood.

14.Slide the top section of the flue and secure it with 2 screws (14a) to the flue support bracket “G” (14b). Refit the grease filter/s and check for correct hood operation.

3

EN

Page 3
Image 3
Hotpoint HTS93G manual Fix the flue support bracket to the wall with two 5 x 45 mm screws