Working Instruction

Document No. : SOP VV09 FA DIS-ASS’Y

 

 

Station :

7(1/1)

Name :

Disassemble SW/C

Ver. :

1.00

Date :

2009/05/18

 

Fig.1

 

 

 

1. Disassemble SW/C , Fig.1 g.1

 

①

 

14” : 6070B0350501

②

②

15” : 6070B0351101

 

￿ Sequence:1￿2￿3

 

 

 

3

 

2. Turn over the K/B , Fig.2

 

 

 

Fig.2

Point for attention: If finding some defects, notice the gaffer and assistant

Fixture list(Fixture standard)

Qty

Fixture list(Fixture standard)

Qty

Zhang Ying

Issuing department: IE

Tabulator:_________

Page 11
Image 11
HP 511 manual Sequence1 2