Working Instruction
Document No. : SOP VV09 FA |
|
| Station : | 7(1/1) | |
Name : | Disassemble SW/C | Ver. : | 1.00 | Date : | 2009/05/18 |
|
Fig.1
|
|
| 1. Disassemble SW/C , Fig.1 g.1 |
| ① |
| 14” : 6070B0350501 |
② | ② | 15” : 6070B0351101 | |
| Sequence:123 | ||
|
| ||
| 3 |
| 2. Turn over the K/B , Fig.2 |
|
|
|
Fig.2
Point for attention: If finding some defects, notice the gaffer and assistant
Fixture list(Fixture standard)
Qty
Fixture list(Fixture standard)
Qty
Zhang Ying | Issuing department: IE |
Tabulator:_________ |