1. Ensure ground is level with playing

 

 

 

 

surface, then dig pole hole.

 

 

 

 

 

WARNING

 

 

PLAYING

 

 

 

 

SURFACE

 

 

 

 

 

 

 

CONTACT UTILITIES

 

 

 

 

 

BEFORE DIGGING.

 

 

24" (61 cm)

 

 

 

 

 

36" (91.4 cm)

 

 

 

 

 

GROUND

 

 

 

 

SURFACE

2.

Install nut (2) to J-bolt (1)

2

2”

 

2

 

3

 

as shown. Repeat

(5.08 cm)

 

 

 

 

 

 

 

procedure for other three

 

 

 

 

 

J-bolts (1).

 

 

 

 

 

IMPORTANT!

 

 

 

 

 

Make sure nuts are 2”

 

 

 

 

 

(5.08 cm) from top of J-Bolts.

1

 

 

 

 

 

 

 

2

 

 

 

 

 

3. Install threaded ends of J-bolts (1) through holes in

1

 

 

 

mounting plate (3) and secure as shown.

 

 

 

NOTE: Make sure J-bolts (1) are in the illustrated

 

 

 

 

position.

 

 

 

 

 

NOTE: Nuts on the top of plate are used for leveling

 

 

 

 

the pole after system is fully assembled.

 

 

 

 

 

3

 

01/03

P/N 211560H

Page 3
Image 3
Huffy AC4062, AC4052, AC4064, AC4054 manual Contact Utilities Before Digging