New Construction – suspended between joists
B11 | B12 |
| F |
| E |
5/8
5/8 1/2 1/2
Slide the mounting rails into brackets.
Position the correct depth mark at the bottom edge of the joist based on the thickness of your sheetrock.
B13 | B14 |
F |
| 1/8” bit |
| ||
|
|
|
Mark position of screws by using holes as a template. | Drill a hole in the center of each outline. |
B15 | B16 |
Insert screws, leaving space between the screw head and the joist. Screws are not provided.
Attach the rails onto the screws.
8 |