New Construction – suspended between joists
B11B12

 

F

 

E

5/8

5/8 1/2 1/2

Slide the mounting rails into brackets.

Position the correct depth mark at the bottom edge of the joist based on the thickness of your sheetrock.

B13B14

F

 

1/8” bit

 

 

 

 

Mark position of screws by using holes as a template.

Drill a hole in the center of each outline.

B15B16

Insert screws, leaving space between the screw head and the joist. Screws are not provided.

Attach the rails onto the screws.

8

42950-01 04/18/2007