IBM PN 10K8798 Installation Time, Tools/Material Required, Installation Steps 9.0 Safety

Models: PN 10K8798

1 10
Download 10 pages 24.92 Kb
Page 6
Image 6
7.0 Installation Time

Installation Instructions

7.0 Installation Time

FFBM

Machine Hrs.

System Hrs.

Nbr of CEs

 

 

 

 

10K8798

0.2

0.0

1

 

 

 

 

Note: To reduce the MES installation time it is recommended that you load the Network Node Processor Code on the Service Processor and install the system unit at the same time.

No impact on 3745 customer operations.

8.0 Tools/Material Required

None.

Installation (Steps 9-12)

9.0 Safety

Review the Safety Notices and the Safety Inspection Procedures located at the beginning of the IBM 3745 Communication Controller All Models, IBM 3746 Expansion Unit Model 900, IBM 3746 Nways Multiprotocol Controller Model 950 Safety Information, GA33-0400.

10.0Details of Installation

10.1Installing and Connecting the NNP

Note: For any unexpected message or error concerning the NNP-B, go to the chapter Problem Determination of the Network Node Processor Installation and Maintenance (Based on 6578), GY27-0407.

1.Using the Network Node Processor Installation and Maintenance (Based on 6578), GY27-0407, go to Chapter 1 and install the NNP following the instructions to install a NNP-B. When completed go to next step.

2.Ask the customer for a maintenance window on 3746-900 with traffic deac- tivated.

3746

PN 42L2445

FFBM

6 of 10

 

 

6

EC F52322

EC F12701A

EC F70078

EC F70110

EC H10024

09 Oct 1998

14 DEC 1998

22 APR 1999

20 JAN 2000

08 MAR 2001

 

 

 

 

 

Page 6
Image 6