Impex CB-339 manual See Diagram

Models: CB-339

1 11
Download 11 pages 8.69 Kb
Page 8
Image 8
STEP 4 (See Diagram 4)

STEP 4 (See Diagram 4)

A.) Attach the Leg Developer (#6) to the open bracket on the Front Support (#10). Secure it with one M10 x 3” Allen Bolt (#30), two ¾” Washers (#33), and one M10 Aircraft Nut (#38).

B.) Insert the two Foam Tubes (#8) halfway through the holes on the Leg Developer. Push four Foam Rolls (#20) onto the Foam Tubes.

C.) Attach the Bar Holder (#12) to the Leg Developer (#6). Secure it with a L-shaped Pin (#15). Remove the Bracket when using the Leg Developer.

D.) Attach the Arm Curl Pad (#19) to the Arm Curl Stand (#11) then secure it with two M8 x 5/8” Allen Bolts (#32) and two 5/8” Washers (#34).

E.) Insert the Arm Curl Stand (#11) into the top opening on the Front Support (#10) and secure with a Lock Knob (#41). Use the Lock Knob to select the Arm Curl height.

F.) Attach a Spring Clip (#42) to the weight post on the Leg Developer. Attach two Spring Clips (#42) to the Curl Bar (#14).

DIAGRAM 4

7

Page 8
Image 8
Impex CB-339 manual See Diagram