STEP 4 (See Diagram 4)

A.)

Insert the Leg Developer Holder (#41) into the opening on the Front Stabilizer (#40).

 

Secure it with the Lock Knob (#6).

B.)

Attach the Leg Developer (#38) to the bracket on the Leg Developer Holder (#41). Secure

 

it with a M12 x 2 3/8” Axle (#36) and M12 Allen Bolt (#45).

C.)

Secure the Leg Developer (#38) with a 4” Lock Pin (#36). Remove the Pin when using the

 

Leg Developer.

D.)

Insert a Foam Roll Tube (#32) halfway through the hole on the Leg Developer Holder

 

(#41). Insert two Foam Roll Tubes (#32) halfway through the holes on the Leg Developer

 

(#38).

E.)

Push six Foam Rolls (#33) onto the Tubes from both sides. Plug six Foam Roll End Caps

 

(#34) to the ends.

F.)

Attach the Olympic Sleeve (#5) onto the weight post on the Leg Developer. Attach the

 

Spring Clip (#44) onto the Olympic Sleeve.

 

DIAGRAM 4

7

Page 8
Image 8
Impex IGS-09 manual Secure it with the Lock Knob #6