STEP 2 (See Diagram 2)
A.) Attach one Floor Stabilizer (#4) in between the two Brackets (#5) to the Right Upright Beam (#3).
B.) Secure it with one M10 x 3” Allen Bolt (#15), two Ø ¾” Washers (#14), and one M10 Aircraft Nut (#13). Repeat the same procedure to install the other side.
C.) Place the Upper Dumbbell Rack (#7) onto the top dumbbell support on the Left & Right Upright Beams. Secure each end with two M10 x 3” Allen Bolts (#15), four Ø ¾” Washers (#14), and two M10 Aircraft Nuts (#13). Do NOT tighten the Nuts and Bolts yet.