STEP 9 (See Diagram 9 & Lower Cable Loop Diagram)
A.) Attach the 156” Lower Cable (#36) to the opening on the Leg Developer (#8). Attach a Pulley to the opening. Secure it with one M10 x 2 3/8” Allen Bolt (#79), two ∅ 5/8” x ½” Pulley Bushings (#61), and one M10 Aircraft Nut (#89).
B.) Draw the Cable underneath the Pulley to the open bracket on the Front Base Frame (#3). Attach a Pulley to the bracket. Secure it with one M10 x 1 ¾” Allen Bolt (#80), two ∅ ¾” Washers (#87), and one M10 Aircraft Nut (#89).
C.) Draw the Cable underneath the Pulley towards back of the machine through the bottom openings on the Vertical Frame (#5) and Butterfly Pulley Bracket (#17) to the open bracket on the Rear Base Frame (#2). Repeat Procedure B above to install a Pulley with a
D.) Draw the Cable underneath the Pulley then pull upward to the Double Floating Pulley Bracket (#24) previously installed in
E.) Draw the Cable around the Pulley then downward. Attach the Cable to an Angled Double Floating Pulley Bracket (#23). Repeat Procedure B above to install a Pulley. Let the Bracket hanging for now.
F.) Draw the Cable around the Pulley then upward to the opening on the Vertical Frame (#5). Attach a Pulley to the opening. Secure it with one M10 x 2 ½” Allen Bolt (#78), two ∅ 5/8” x 5/8” Pulley Bushings (#60), and one M10 Aircraft Nut (#89).
G.)Insert the Cable through a Nylon Ball Stopper (#96). Attach the Cable to a
18