Impex MWB/765 manual Diagram

Models: MWB/765

1 13
Download 13 pages 22.82 Kb
Page 10
Image 10

STEP 6 (See Diagram 6)

A.) Attach the ball end of the Cable (#18) to a Pulley (#26). Place the Pulley in the open slot on top of the Lat Bar Frame (#15). Secure the Pulley with one M10 x 2 3/8” Allen Bolt (#55), two Pulley Bushings (#29), and one M10 Aircraft Nut (#49).

B.) Draw the Cable over the Pulley to the open bracket on the Lat Bar Frame. Attach a Pulley to the bracket. Secure it with one M10 x 2” Allen Bolt (#56), one L-shaped Pulley Cover (#27), two ¾” Washers (#48), and one M10 Aircraft Nut (#49).

C.) Draw the Cable over the Pulley then downward to the Weight Holder (#16). Secure the tip of the Cable to the Weight Holder with one M10 x 1” Allen Bolt (#53), two ¾” Washers (#48), and one M10 Aircraft Nut (#49).

D.) Connect the Lat Bar (#17) by using a C-clip (#57) to the Chain (#28). Adjust the length of Chain to obtain the desired height of the Lat Bar exercise. Then connect the Chain to the Cable (#18) with a C-clip (#57).

DIAGRAM 6

9

Page 10
Image 10
Impex MWB/765 manual Diagram