STEP 4 (See Diagram 4)
A.) Attach the Leg Developer (#14) to the bracket on top of the Leg Developer Holder (#5). Secure it with an Axle (#48), two ∅ ¾” Washers (#45), and two M10 x 5/8” Allen Bolts (#43). Slide the Olympic Sleeve (#55) onto the post on the Leg Developer. Attach a Spring Clip (#21) to the Sleeve. Note: When using the decline position to do Ab exercises, place at least 30lbs of weights on the Sleeve to hold down the Leg Developer.
B.) Insert one Foam Roll Tube (#15) halfway through the hole on the Leg Developer Holder. Insert two Foam Roll Tubes (#15) halfway through the holes on the Leg Developer (#14). Push six Foam Rolls (#16) onto the Tubes from both sides. Plug six Foam Roll End Caps (#33) to the ends.
C.) Attach the Arm Curl Pad (#19) to the Arm Curl Stand (#13). Secure it with two M8 x 5/8” Hex Bolts (#42) and ∅ 5/8” Washers (#46). Insert the Arm Curl Stand into the top opening in front of the Seat.
D.) Attach the Curl Bar Holder (#49) to the Leg Developer (#14). Align the holes and secure it with 2 ¾”
7