STEP 4 (See Diagram 4)
A.) Attach the Leg Developer (#8) to the Leg Developer Holder (#9). Secure it with an Axle (#23), two M10 x 5/8” Allen Bolts (#37), and two Ø ¾” Washers (#42).
B.) Insert one Foam Tube (#16) halfway through the hole on the Leg Developer Holder. Insert two Foam Tubes halfway through the holes on the Leg Developer.
C.) Push six Vinyl Foam Rolls (#24) onto the Tubes from both ends. Plug six Foam Roll End Caps (#27) into the ends.
D.) Attach an Olympic Sleeve (#25) onto the weight post on the Leg Developer. Attach a Spring Clip (#22) to the Sleeve.
E.) Attach the Arm Curl Pad (#19) to the Arm Curl Stand (#7). Secure it with two M8 x 5/8” Allen Bolts (#39) and two Ø 5/8” Washers (#43).
F.) Insert the Arm Curl Stand into the opening on the Leg Developer Holder. Secure it with a Lock Knob (#26).
DIAGRAM 4
8