UP INSTRUCTIONS
(88PO) OVAL FRAME POOL ENGLISH 7.5” X 10.5” PANTONE 295U 09/14/2007
88PO
POOL SET UP (continued)
3.Be sure the liner is opened and spread out to its fullest extent on top of the ground cloth. Starting with one side, slide the closed end of “A” beam first into the sleeve openings located near the corner. Continue with “B” beam snapping into the “A” beam, and another “C” beam snapping into the “B” beam.
Keep the metal beam holes aligned with the white liner sleeve holes.
Continue inserting all
The combinations for beams are different for different sizes of pools, see the chart below for detail. (Be sure all sides end up with the metal beam holes aligned with the white liner sleeve holes.)
Size of Pool | No. of | Beam Combinations | |||
18’ x10’ (549 cm x 305 cm) & 20’ x 12’ (610 cm x 366 cm) |
| 2 |
|
| |
24’ x 12’ (732 cm x 366 cm) |
| 3 |
|
| |
28’ x 12’ (853 cm x 366 cm) |
| 4 |
|
| |
4. Slide the restrainer strap (9) onto the large | 9 | 11 | 10 | 3 | |
side support (12). Repeat for all restrainer straps and |
|
| |||
|
|
|
| ||
|
|
|
|
| |
IMPORTANT: The liner is to remain flat on the |
|
|
|
| |
ground during the next step #5. This is why 5 - 6’ |
|
|
|
| |
of clearance space around the pool is necessary. |
|
|
|
| |
|
|
| 12 |
|
|
SET-
5.• The tops of the
•Squeezing this bottom button will allow the support to enter the beam. Once the
4
9
11 12
6. Insert the connecting rods into the overlapping
openings, to connect the liner straps to the restrainer straps (see drawing 5).
5
8
SAVE THESE INSTRUCTIONS
Page 10