SET-UP INSTRUCTIONS

(88PO) OVAL FRAME POOL ENGLISH 7.5” X 10.5” PANTONE 295U 09/14/2007

88PO

POOL SET UP (continued)

This pool may have been purchased with the Intex Krystal Clear™ filter-pump. The filter-pump has a separate set of installation instructions and is to be set-up after assembling this unit.

1. • Remove the ground cloth from carton. Spread it out completely with its edges being at least 5 - 6’ (1.5 - 2.0 m) from any obstacle such as walls, fences, trees, etc.

• Remove the liner (7) from carton and place

 

 

 

1

it on top of the ground cloth with the drain

 

 

 

valve towards the draining area. Place the

 

 

drain valve away from the house. Open it

 

 

up to warm it in the sun. This warming will

 

 

make installation easier. Make sure the

 

 

liner is centered atop the ground cloth. Be

7

 

sure to face the end with the 2 hose

 

connectors towards the electrical power

 

 

 

 

source.

IMPORTANT: Do not drag the pool liner across the ground as this may result in leaks or other damage (see drawing 1).

2.Remove all the parts from the carton(s) and place them on the ground in the location where they are to be assembled (see drawings 2.1, 2.2 and 2.3). Check the parts listing and be sure all the pieces to be assembled are accounted for.

IMPORTANT: Do not start assembly if any pieces are missing. For replacement pieces call the Consumer Service telephone number in your area.

After all pieces are accounted for move the pieces away from the liner for of installation.

 

 

2.1

 

 

2.2

(C)

(A)

 

(C)

(B)

(A)

LINER

 

LINER

 

(A)

(C)

(A)

(B)

(C)

 

 

 

 

18’ X 10’ & 20’ X 12’

 

24’ X 12’

 

2.3

 

(C)

(B)

(B)

(A)

 

 

LINER

 

 

(A)

(B)

(B)

 

(C)

28’ X 12’

SAVE THESE INSTRUCTIONS

Page 9