Invacare 3650, 3600XL manual Post Installation Checklist, Plumbing Installation

Models: 3600XL 3600 3650

1 36
Download 36 pages 42.54 Kb
Page 21
Image 21

SECTION 2—PARTS AND INSTALLATION

9.Check for leaks in supply or drain lines and check operation of tub. Refer to Operating Instructions on page 22.

NOTE: Check local codes regarding maximum water temperature allowed at hot water outlets for facility type.

DETAIL “A” -

In House Water Service

PLUMBING

HOT

COLD

SCHEMATIC

Optional

 

 

Pressure

 

 

Regulator

RADA Mixing Valve

 

 

 

Tub Fill Valve

Shower Control

Tub Spout

Valve

 

 

(Nearest

Tub)

Disinfectant

Back

 

Backflow

Injector

 

 

Preventor

 

Flow

3-Way

 

 

 

 

 

 

 

Selector

Burp

 

 

Valve

 

 

Fitting

 

 

 

Flowmeter

Check

 

 

 

Check

 

 

Valve

 

 

 

Valve

Pump

 

 

 

Invacare

Disinfectant

Suction Return Line

FIGURE 2.5 Plumbing Installation

Post Installation Checklist

Before putting the tub into service, check the following:

Water lines have been purged of any foreign matter.

Both hot and cold water lines are properly connected to tub.

Dedicated 115V 15AMP AC power line is properly wired to unit.

Power line is protected by a 15AMP GFCI.

All water lines are checked for leaks.

ICCG skin care and cleaning products have been ordered. To place your order, call 800‐668‐2337.

ICCG representative has been called at 800‐668‐2337 to arrange for an In‐Service on tub.

Part No 1118387

21

Side Entry Whirlpool Tub

Page 21
Image 21
Invacare 3650, 3600XL manual Post Installation Checklist, Plumbing Installation