Tumblers – 120 and 170

Tumbler Enclosure

WARNING

To reduce the risk of severe injury, clearance of tumble dryer cabinet from combustible construction must conform to the minimum clearances.

W056R1

1

2

3

 

 

4

5

6

7 TMB2020N

8

TMB2020N

NOTE: Shaded areas indicate adjacent structure.

10.5 in. (13 mm) recommended between machines for removal or installation.

2Allow 2-4 in. (51-102 mm) opening at top of machine to aid in removal or installation. A removable trim piece may be used to conceal the opening; zero clearance allowed for trim.

34 in. (102 mm) maximum header thickness

4Minimum clearance permitted for remainder: Gas 4 in. (102 mm), Steam 12 in. (305 mm)

5Guard

6Provision for Make-Up Air

724 in. (610 mm) minimum, 36 in. (914 mm) recommended for maintenance purposes

80.25 in. (6 mm) recommended for removal or installation purposes, zero clearance allowed

Figure 1

3-09-71