Page 14

J-400

Figure D

50hz terminal block Connection

L2
L1
L1
L2

1. Main Terminal Block

2. Heater Terminal Block

3. Bonding Lug/Grounding Terminal

4. Power wires Entrance (Electrical tting and conduit must be

installed)

Figure e

Terminal Connection

(export 230 VaC 50 Hz Connection shown)

** May only require one green

grounding wire. Check your local

country codes.

*Electrical tting and conduit must be installed
L2
L1
L1
L2
Main
Terminal
Block Use screwdriver
to pry open
the connector
Insert power
wires and
secure
connection
Power In*
L2
L1
Heater
Terminal
Block
Use screwdriver
to pry open
the connector
Insert power
wires and
secure connection
L1
L2
Power In*
Green**
BRW BRW
BLU
BLU
Power In*
Main
Terminal
Block
Grounding
Lug
L2L1
L1L2
Heater
Terminal
Block
BLU
BRW
BLU
BRW
Green**
3
1
4
2