Page 13
J-400
Figure b
60hz terminal block Connection
L2
L1
1. Main Terminal Block
2. Bonding Lug/Grounding Terminal
3. Power wires Entrance (Electrical tting and conduit must be
installed)
Figure C
Terminal Connection
(north american 240 VaC Connection shown)
*Electrical tting and conduit must be installed
BLK
RED
Power In*
Green
L2L1
Main
Terminal
Block
Grounding
Lug
2
1
3