Jacuzzi Steam Enclosure installation instructions Step, J K J

Models: Steam Enclosure

1 8
Download 8 pages 13.27 Kb
Page 6
Image 6
J

Step 7

All units are equipped with safety tee-lock jambs. When installed properly the header is permanently locked to the jambs and cannot be accidently dislodged. Slide the safety lock of the remaining wall jamb and jamb filler into the header. The rounded surface of the header goes to the exterior and the jamb filler should be positioned with the opening closet to the exterior of the wall jamb.

Holding the header at an angle engage the opposite end onto the mounted wall jamb and press the wall jamb into position on the bath track. Attach to the wall per Step 4.

TEE-LOCK

I

D

I

D

A

Step 8

Obscure glass panels are installed with the rough side of the glass to the exterior. Attach rollers to the interior panel (rough glass surface closest to the top fin) and the exterior (rough surface away from the top fin using four 8-32 x 3/8" hex head screws. Press four vinyl silencers into the slots in the fin on the bottom of both panels.

J

K

J

ROUGH

SURFACE

INTERIOR

EXTERIOR

PANEL

PANEL

L

4

Page 6
Image 6
Jacuzzi Steam Enclosure installation instructions Step, J K J